A water discharge permit is a legal authorization to release specified pollutants into protected waters under set conditions. Under the Clean Water Act it is called an NPDES permit, usually issued by a state agency that runs the program for the EPA. Most crop farms do not need one for ordinary field operations, but some livestock operations, certain pesticide applications to water and a few other activities can.

If you need a permit, it typically sets limits, requires a plan, and demands monitoring, recordkeeping and reporting. If you do not need one, you may still need to prove it by showing you do not discharge. This guide explains the types of permits, who commonly needs them, and how to move through the process. Rules and names vary by state, so confirm with your state agency.

What the permit is and is not

An NPDES permit is a written document with enforceable conditions. It is not a one-time approval; it lasts for a fixed term and must be renewed, and violations of its terms can bring penalties. Permits generally cover:

  • Who and where: the operation, its location and the outfalls or discharge points.
  • What: which pollutants may be discharged and any numeric or practice-based limits.
  • How: required management practices, such as a nutrient plan or storage design standards.
  • Proof: monitoring, inspections, recordkeeping and annual reporting.

Permits are not a license to pollute without limit. They set the conditions under which a discharge is legal.

Who typically needs one on a farm

SituationPermit often needed?Notes
Large confined animal operation that dischargesOften yesSee [[a:concentrated-animal-feeding-operation-rulesCAFO rules]]
Medium operation meeting certain triggersSometimesDepends on how waste reaches water
Cropland stormwater and irrigation return flowGenerally exemptStatutory exemptions
Aquaculture facilitiesSometimesDepends on size and discharge
Pesticide applied directly to or near waterSometimesOften a general permit
Food processing wastewater on farmSometimesState rules vary

The size thresholds and triggers are set in federal and state regulations, which you can read in the eCFR, but your state agency can tell you how it applies them.

General versus individual permits

  • General permit: a standard permit that covers many similar operations. You usually file a notice of intent and agree to the conditions. It is faster and cheaper.
  • Individual permit: written for one facility, with conditions tailored to the site. It takes longer and involves more detailed information and sometimes public comment.

Many states have a general permit for livestock operations and one for pesticide discharges. Whether you can use one depends on your facts.

Step-by-step: finding out and applying

  1. Describe your operation. Animal types and numbers, housing, manure storage, how waste leaves the site, and nearby waters.
  2. Ask the state agency for a permit determination. Many agencies have a form or a contact for agricultural facilities. Ask whether you need coverage and request the answer in writing.
  3. Choose the permit type with the agency's help.
  4. Gather the application materials. Typical items include site maps, a nutrient management plan, storage structure details and land application acreage.
  5. File and pay any fee. Fees vary by state; ask the agency for the current schedule.
  6. Read the final permit end to end, and calendar each deadline for monitoring, inspections and reports.
  7. Train anyone who works in the system so they know the permit conditions.

Our step-by-step guide on CAFO permit requirements expands the livestock side, and how to get a farm environmental permit covers the general application process.

Worked example

A hypothetical dairy with 450 milking cows and a lined manure storage plans to expand to 600. The owner knows that crossing certain animal-number lines can change regulatory status, so the owner asks the state agency before building. Adding 150 animals brings the herd to 600 cows, a one-third increase on the original 450. The agency explains what changes in status the expansion could trigger and which plan updates are needed. The owner schedules design work and submits an updated plan before pouring concrete, which keeps the project from stalling at inspection.

The takeaway is not the numbers, which are only illustrative, but the sequence: ask first, document the answer and then build.

Monitoring and recordkeeping

Permits generally require recordkeeping that can include:

  • Inspection logs for storage structures and outlets, often weekly or after storms.
  • Manure and wastewater application records with dates, rates and fields.
  • Test results for manure and soil.
  • Mortality handling records.
  • Records of any overflow or release and the response.

Keep records for the period the permit requires, which is commonly several years, and have them ready for inspectors. See how to document farm environmental compliance.

If something goes wrong

A discharge that violates the permit, or a release when no permit exists, often triggers a duty to notify an agency quickly. Learn your permit's reporting timeline in advance, and post the phone numbers where staff can find them. The consequences of unreported releases are usually worse than the release itself. For response steps, see how to respond to environmental violations.

Every farm family knows the feeling of a storm arriving right after you finish the lagoon paperwork. The FARM.FM Today page is handy for checking the sky before you check the permit.

Permit paperwork has a way of arriving just as the hay is ready, which is why the FARM.FM satire page keeps a running tally of farm forms.

When to call a professional

  • Environmental attorney: for permit applications involving expansion, contested conditions, enforcement letters or citizen suit notices. Bring your site plan, current permits and correspondence.
  • Licensed engineer or certified planner: for storage design and nutrient plans. Bring soil tests, field maps and herd data.
  • State agency permit staff: for early guidance on applicability.
  • NRCS staff: for conservation planning and possible cost-share. Find your office through the USDA service center locator and see the NRCS site.
  • Insurance agent and CPA: for coverage gaps and the tax handling of compliance costs.

Frequently asked questions

Do I need a permit if I never discharge anything?

Many agencies treat the question as whether you "propose to discharge," which depends on design and operation, not just intent. If your facility is designed so that no discharge occurs except in extreme weather, ask your state agency how it treats that situation.

How long does a permit last?

Permits are issued for a fixed term and must be renewed before they expire. The term is set by law and the issuing agency, so check your permit and calendar the renewal deadline early.

Can a permit be changed after it is issued?

Yes, through modification procedures, and expansions or changes in operation often require them. Tell the agency before you change animal numbers, add storage or alter how waste is handled.

What happens if I miss a reporting deadline?

Late or missed reports are violations that can lead to warning letters or penalties. If you miss one, file as soon as possible and contact the agency to explain; an attorney can help if the issue is more serious.

Clean Water Act Rules for FarmsPrevious articleConcentrated Animal Feeding Operation RulesNext article

Keep learning

Farm tax and legal rules change and differ by state. Confirm current details with a licensed attorney, a CPA or enrolled agent, and the agencies involved.

Browse the state directory for tax agencies, business filing offices, lawyer referral, labor and environmental agencies, mediation and Extension contacts near you.

General information only, not legal, tax or financial advice. No attorney-client or accountant-client relationship is created by reading this article. Facts, state law and tax rules change, so verify before you act.